Technopark - Kollam

TECHNOPARK Kollam Plug & Play  SBC  facilty( in SEZ. ) Booking Open. Please Click here for more details

 

 

Technopark as part of the hub and spoke model of development is expanding its activities to Kundra, Kollam, which is 63 km away from the Trivandrum Campus. This is to tap the Kerala's unique advantage of uniform talent distribution, Infrastructure and supporting IT platforms, e.g. telecom, datacom and digital exchanges, excellent infrastructure availability and back-up support. Technopark Kollam is located in 44.46 acres of prime land beside scenic Kanjirode Lake. This park is being developed as a Special Economic Zone.

 

FACT SHEET:

* Project area: 44.46 Acres

* 22 Kms. from Kollam City

* 70 Kms. from the Trivandrum International Airport

* Location: On the banks of Kanjirode lake, a tributary to Ashtamudi lake

* Type of development: SEZ

* Basic infrastructure- power, water, roads, telecom, datacom, water treatment plant STP, Executive Hostel, Health, Club, Food Court etc.

 

OFFERINGS:

* SEZ Land parcels available for IT/ITES Companies and/or developers on long lease

* SEZ Built-up space available on monthly rental basis to be ready by January 2013

 

 

WORKS IN PROGRESS (Updated on 03.01.2013)

Construction of IT Building.

 

 

 

 

Present Status

  • Finishing works are nearing completion.
  • HVAC, Electrical, Plumbing works also nearing completion.
  • Structural glazing and Aluminium cladding works nearing completion.

 

 

 

 

 

 

 

2. Site Development, Construction of roads etc:

 

 


 

Present Status

  • Earth work excavation / filling works to formation levels for Road Work: 100% completed.
  • Excavation, DR/RR and masonry works for boundary wall foundation is in progress 100% completed.
  • RR masonry for superstructure 100% completed.
  • Drain and duct work 100 % completed.
  • Tunnel work 100 % completed.
  • Road work 100 % completed

 

 

3. 110 KV Sub station:

 

Present Status


  • Testing is going on.
  • Tower erection work completed.
  • Chain link fencing completed


 

 

4. 11 KV Compact Sub station:

 

Present Status :

Works completed.

 

5. Electrical Works for IT Building


Present Status


  • Pre-commissioning work is going on

 

 

 

 

6. HVAC Works for IT Building.

 

Present Status

  • Pre commissioning work is going on

 

 

 

 

7. Over Head Water Tank and Water Distribution System:


Present Status


  • Finishing works of OHWT going on.
  • Pump house works 100% completed.

.

 

 

 

 

 

 

 

8. STP Works

 

Present Status

  • Testing is going on.
  • Painting works of the Biogas plant work remaining.
  • Pumps erection completed.

 

 


9. Embankment protection work

  • Gabion Wall embankment work 100% completed. Rubble masonry work over the gabion completed.
  • Gabion wall works at the boat jetty portion remaining.

 

 

 

10.Entrance Gate Structure

  • All works completed.

 

 

11. Street Lighting works

  • Street lighting system installed.

 

 

 

12. Water Supply Scheme by KWA

  • Finishing works on Intake well completed.
  • Pipe laying works for full length completed.
  • Finishing works on pump house at Technopark progressing and nearing completion.
  • Finishing work of filter house going on.